CHEMICAL PROCESSING

Parsons Case Study:
chemical processing

Executive Summary

A multi-national chemical producer with a facility in the UK utilises bulk Chlorine delivered by road tanker, and as a result strict Health and Safety requirements have to be maintained.

Challenges

Chlorine was used in World War 1 as the first gaseous chemical warfare agent, therefore safe handling of the material is paramount when receiving a bulk delivery.

Following a routine inspection the client found their existing Emergency Chlorine Vent System needed some urgent maintenance, which meant a short term solution was required to cover the maintenance  period.

Solution

As Parsons is the only UK company to offer short and long term scrubber rental they were able to offer a solution, and have it delivered to site within seven days.

The Emergency Chlorine Vent System was manufactured from polypropylene GRP, and was designed based on Parsons standard Emergency Chlorine Vent Systems installed in the UK and Far East.

Parsons offer a complete range of packaged Chlorine scrubbers for any sized bulk storage system.

Results

The client was able to carry out their urgent maintenance, and safe in the knowledge that they had an Emergency Chlorine Vent System on site should the need arise.

Call if you have any queries

If you have queries what-so-ever, please do not hesitate to contact us.
Please call on +44 (0) 1922 404318 or alternatively, send us an email.

Email Us Now